OFFICEENGby ConKey Buy for 2,176 ETB

Office Engineer Complete Toolkit · Building + Road

Every record the project office keeps, ready on day one.

346 files for building and road projects in Ethiopia: editable Word forms and letters, Excel workbooks that calculate for you, and an 18-chapter manual. From the first letter to the final account.

2,176 ETB

One payment.
No subscription.

Pay withtelebirrCBE BirrBankCard

Checkout by Chapa on Ye-Buna. Download the ZIP right after payment.

No macros. Plain Excel formulas you can check.

ETB and 15% VAT built into the payment workbooks.

FIDIC and PPA based letters and registers.

Your logo in every Word header.

Real pages from the package

Open a page before you buy.

Tap any picture to see it full size. These are the actual files, filled in for the illustrative sample projects.

Interim Payment CertificateCumulative IPC with retention, advance recovery, materials on site, price adjustment and 15% VAT - every figure is a formula.
S-curve and progressPlanned against actual cumulative progress with monthly variance and SPI, charted automatically.
Mass haul diagramCut and fill by chainage with earthwork factor, mass ordinates and balance points for road projects.
Correspondence dashboardLetters in and out, overdue responses, search and monthly charts from the correspondence registers.
Request for InspectionOne of 162 editable Word forms with your logo in the header, shown completed for the sample building.
Office Engineer Manual18 chapters of procedures, worked examples and common mistakes - this page covers payment certificates.

What's inside

Two toolkits, one shared office system.

Tap a module to see every file in it.

Building Toolkit B01-B10

BOQ, IPC and cost control with earned value, programmes and S-curves, ITP and 15 inspection checklists, and records for 14 building work categories.

B01Project Administration11 files

5 Word · 6 Excel

  • Project Information SheetWord
  • Project Organization Chart TemplateWord
  • Project Contact DirectoryExcel
  • Contract Document RegisterExcel
  • Document Control RegisterExcel
  • Incoming Correspondence RegisterExcel
  • Outgoing Correspondence RegisterExcel
  • Meeting Minutes TemplateWord
  • Action Tracking RegisterExcel
  • Project Filing StructureWord
  • Document Transmittal FormWord
B02Technical Documentation11 files

5 Excel · 6 Word

  • Drawing RegisterExcel
  • Drawing Revision RegisterExcel
  • Drawing Submission RegisterExcel
  • Request for Information FormWord
  • RFI RegisterExcel
  • Shop Drawing Submission FormWord
  • Material Submittal FormWord
  • Technical Submittal RegisterExcel
  • Method Statement Submission FormWord
  • Technical Clarification RequestWord
  • Drawing Discrepancy NotificationWord
B03Planning and Progress Monitoring12 files

12 Excel

  • Baseline Work Program TemplateExcel
  • Weekly Work ProgramExcel
  • Monthly Work ProgramExcel
  • Two-Week Look-Ahead ScheduleExcel
  • Progress Monitoring RegisterExcel
  • Planned vs Actual Progress TrackerExcel
  • S-Curve WorkbookExcel
  • Manpower Deployment RegisterExcel
  • Equipment Utilization RegisterExcel
  • Daily Progress ReportExcel
  • Weekly Progress ReportExcel
  • Monthly Progress ReportExcel
B04Quantity and Cost Management11 files

9 Excel · 2 Word

  • BOQ Management WorkbookExcel
  • Quantity Take-Off SheetsExcel
  • Measurement SheetsExcel
  • Work Quantity Tracking RegisterExcel
  • IPC Preparation WorkbookExcel
  • Payment Application TemplateWord
  • Variation Order RegisterExcel
  • Variation Proposal TemplateWord
  • Cost Control WorkbookExcel
  • Claims and Notice RegisterExcel
  • Final Quantity ReconciliationExcel
B05Materials and Procurement9 files

4 Excel · 5 Word

  • Material Procurement ScheduleExcel
  • Material Submittal RegisterExcel
  • Material Approval FormWord
  • Material Inspection RequestWord
  • Material Delivery NoteWord
  • Material Receiving ReportWord
  • Material Consumption RegisterExcel
  • Material Reconciliation WorkbookExcel
  • Material Rejection ReportWord
B06Quality Control Documentation14 files

12 Word · 2 Excel

  • Inspection and Test PlanWord
  • Request for InspectionWord
  • Inspection RegisterExcel
  • Concrete Inspection ChecklistWord
  • Reinforcement Inspection ChecklistWord
  • Formwork Inspection ChecklistWord
  • Masonry Inspection ChecklistWord
  • Plastering Inspection ChecklistWord
  • Waterproofing Inspection ChecklistWord
  • Finishing Works Inspection ChecklistWord
  • Non-Conformance ReportWord
  • Corrective Action ReportWord
  • Quality Control Monthly ReportWord
  • Test Result RegisterExcel
B07Building-Specific Technical Records22 files

14 Excel · 8 Word

  • Earthwork and Excavation Records WorkbookExcel
  • Foundation Construction Records WorkbookExcel
  • Reinforced Concrete Records WorkbookExcel
  • Reinforcement Steel Records WorkbookExcel
  • Formwork Records WorkbookExcel
  • Masonry and Blockwork Records WorkbookExcel
  • Waterproofing Records WorkbookExcel
  • Roofing Records WorkbookExcel
  • Doors and Windows Records WorkbookExcel
  • Floor and Wall Finishes Records WorkbookExcel
  • Plumbing and Sanitary Works Records WorkbookExcel
  • Electrical Works Records WorkbookExcel
  • HVAC Records WorkbookExcel
  • Fire Protection Systems Records WorkbookExcel
  • Earthwork and Excavation Inspection ChecklistWord
  • Foundation Inspection ChecklistWord
  • Roofing Inspection ChecklistWord
  • Doors and Windows Inspection ChecklistWord
  • Plumbing and Sanitary Inspection ChecklistWord
  • Electrical Works Inspection ChecklistWord
  • HVAC Inspection ChecklistWord
  • Fire Protection Inspection ChecklistWord
B08Subcontractor Management7 files

3 Excel · 4 Word

  • Subcontractor RegisterExcel
  • Subcontract Agreement Information SheetWord
  • Scope of Work TemplateWord
  • Subcontractor Work Progress RegisterExcel
  • Subcontractor Payment TrackingExcel
  • Subcontractor Evaluation FormWord
  • Subcontractor Coordination Meeting MinutesWord
B09Project Reporting8 files

5 Word · 3 Excel

  • Daily Site ReportWord
  • Weekly Site ReportWord
  • Monthly Progress ReportWord
  • Photographic Progress ReportWord
  • Project Risk RegisterExcel
  • Issue RegisterExcel
  • Delay RegisterExcel
  • Management Summary ReportWord
B10Project Completion and Handover10 files

4 Word · 6 Excel

  • Snag ListWord
  • Punch List RegisterExcel
  • As-Built Drawing RegisterExcel
  • Testing and Commissioning RegisterExcel
  • O&M Manual Submission RegisterExcel
  • Final Measurement SheetExcel
  • Final Account Preparation ChecklistWord
  • Taking-Over Inspection RequestWord
  • Project Handover ChecklistWord
  • Defects Liability Tracking RegisterExcel

Road Toolkit R01-R10

Cross-sections, average end area, cut/fill and mass haul, pavement layer quantities, culverts, 9 laboratory test records and chainage-based records for 16 activities.

R01Project Administration11 files

5 Word · 6 Excel

  • Road Project Information SheetWord
  • Road Project Organization Chart TemplateWord
  • Project Contact DirectoryExcel
  • Contract Document RegisterExcel
  • Document Control RegisterExcel
  • Incoming Correspondence RegisterExcel
  • Outgoing Correspondence RegisterExcel
  • Road Site Meeting Minutes TemplateWord
  • Action Tracking RegisterExcel
  • Road Project Filing StructureWord
  • Document Transmittal FormWord
R02Technical Documentation10 files

8 Excel · 2 Word

  • Road Drawing RegisterExcel
  • Alignment and Profile RegisterExcel
  • Cross-Section RegisterExcel
  • Setting-Out RecordWord
  • Survey Data Submission RegisterExcel
  • RFI RegisterExcel
  • Shop Drawing RegisterExcel
  • Method Statement RegisterExcel
  • Technical Submission RegisterExcel
  • Request for Information FormWord
R03Planning and Progress8 files

7 Excel · 1 Word

  • Road Construction Work ProgramExcel
  • Weekly and Monthly Work ProgramExcel
  • Look-Ahead ScheduleExcel
  • Progress Monitoring WorkbookExcel
  • S-CurveExcel
  • Equipment Productivity RegisterExcel
  • Manpower RegisterExcel
  • Road Construction Daily ReportWord
R04Quantity and Measurement17 files

17 Excel

  • BOQ ManagementExcel
  • Earthwork Quantity CalculationExcel
  • Cut and Fill CalculationExcel
  • Cross-Section Area CalculationExcel
  • Average End Area MethodExcel
  • Mass Haul Diagram DataExcel
  • Embankment QuantityExcel
  • Subgrade QuantityExcel
  • Selected Material QuantityExcel
  • Subbase QuantityExcel
  • Crushed Aggregate Base QuantityExcel
  • Asphalt QuantityExcel
  • Drainage QuantityExcel
  • Culvert QuantityExcel
  • Measurement SheetsExcel
  • IPC PreparationExcel
  • Variation ManagementExcel
R05Materials and Laboratory20 files

18 Excel · 2 Word

  • Material Approval RegisterExcel
  • Material Source Approval FormWord
  • Soil Testing RegisterExcel
  • Aggregate Testing RegisterExcel
  • CBR Test RegisterExcel
  • Proctor Test RegisterExcel
  • Field Density Test RegisterExcel
  • Asphalt Testing RegisterExcel
  • Concrete Testing RegisterExcel
  • Laboratory Test SummaryExcel
  • Material Inspection RequestWord
  • Sieve Analysis Test RecordExcel
  • Atterberg Limits Test RecordExcel
  • Proctor Compaction Test RecordExcel
  • Field Density Test Record (Sand Cone)Excel
  • CBR Test RecordExcel
  • Aggregate Crushing Value Test RecordExcel
  • Los Angeles Abrasion Test RecordExcel
  • Bitumen Test RecordExcel
  • Asphalt Mix Marshall Test RecordExcel
R06Quality Control20 files

19 Word · 1 Excel

  • Road Inspection and Test PlanWord
  • Request for Inspection (Layer Works)Word
  • Road Inspection RegisterExcel
  • Site Clearing Inspection ChecklistWord
  • Earthworks Inspection ChecklistWord
  • Embankment Inspection ChecklistWord
  • Subgrade Inspection ChecklistWord
  • Selected Material Inspection ChecklistWord
  • Subbase Inspection ChecklistWord
  • Crushed Aggregate Base Inspection ChecklistWord
  • Prime Coat Inspection ChecklistWord
  • Tack Coat Inspection ChecklistWord
  • Asphalt Concrete Inspection ChecklistWord
  • Culverts Inspection ChecklistWord
  • Side Drains Inspection ChecklistWord
  • Retaining Structures Inspection ChecklistWord
  • Concrete Structures Inspection ChecklistWord
  • Road Furniture and Signage Inspection ChecklistWord
  • Road Marking Inspection ChecklistWord
  • Non-Conformance Report (Road)Word
R07Road-Specific Technical Records16 files

16 Excel

  • Site Clearing Records WorkbookExcel
  • Earthworks Records WorkbookExcel
  • Embankment Records WorkbookExcel
  • Subgrade Records WorkbookExcel
  • Selected Material Records WorkbookExcel
  • Subbase Records WorkbookExcel
  • Crushed Aggregate Base Records WorkbookExcel
  • Prime Coat Records WorkbookExcel
  • Tack Coat Records WorkbookExcel
  • Asphalt Concrete Records WorkbookExcel
  • Culverts Records WorkbookExcel
  • Side Drains Records WorkbookExcel
  • Retaining Structures Records WorkbookExcel
  • Concrete Structures Records WorkbookExcel
  • Road Furniture and Signage Records WorkbookExcel
  • Road Marking Records WorkbookExcel
R08Equipment and Resources6 files

5 Excel · 1 Word

  • Equipment RegisterExcel
  • Daily Equipment ReportWord
  • Equipment Utilization RegisterExcel
  • Fuel Consumption RegisterExcel
  • Equipment Productivity WorkbookExcel
  • Plant Maintenance RecordExcel
R09Project Reporting7 files

5 Word · 2 Excel

  • Daily Site DiaryWord
  • Weekly Progress ReportWord
  • Monthly Progress ReportWord
  • Photographic Progress ReportWord
  • Delay RegisterExcel
  • Risk RegisterExcel
  • Management Summary ReportWord
R10Completion and Handover7 files

6 Excel · 1 Word

  • As-Built Road Drawing RegisterExcel
  • Final Survey RegisterExcel
  • Final Measurement RecordsExcel
  • Laboratory Test CompilationExcel
  • Defects Liability RegisterExcel
  • Final AccountExcel
  • Road Project Handover ChecklistWord

Office Engineer Manual

18 chapters, 43 pages: roles, contract administration, document control, drawings and RFIs, quantities, payment certificates, variations, claims, quality, reporting and handover - each with procedures, examples and common mistakes.

Correspondence system

50 ready letters (RFI, approvals, notices, delay, EOT, payment and more), incoming and outgoing forms and registers, and a workbook with automatic references, response tracking and overdue alerts.

Worked examples

A G+7 mixed-use building (18 files, IPC No. 05) and a 10 km road (16 files, IPC No. 07) completed end to end, so you can see how every record is filled. Sample data is labelled illustrative.

Start-here and reference guides

User guide, folder guide and naming convention, plus a glossary, standards guide, measurement formulas, routine checklists and a contract-administration quick reference. Three Excel indexes list every file.

Why it matters

Disputes are won and lost on records.

When a drawing arrived, whether a notice went out on time, how much work was done - the office engineer's files answer those questions. OFFICEENG gives the whole team one consistent system so nothing is missing when the claim, the audit or the final account comes.

  • Registers that number themselves. References, deadlines and overdue flags are formulas.
  • Payment you can defend. Cumulative IPC method: previous, this period and to date on every line.
  • Quality records that close out. ITP, request for inspection, checklists, test registers, NCR and corrective action.
  • Your project, your limits. Acceptance limits and contract periods are inputs taken from your own specification and contract - none are invented.
  • Built for Ethiopian projects. Amounts in ETB, VAT at 15%, road records by chainage, letters for FIDIC-based and PPA contracts.

FAQ

Questions engineers ask.

Who is it for?

Office engineers, site and project engineers, quantity surveyors, construction managers, contractors, consultants and resident engineers working on building or road projects in Ethiopia.

What do I get for 2,176 ETB?

Everything: the Building Toolkit, the Road Toolkit, the shared Office Engineer Manual and correspondence system, both worked examples and all reference guides - 346 files in one ZIP download. One payment, no subscription.

Can I buy only the Building or only the Road toolkit?

Not at the moment. Both toolkits come together in this one package.

What software do I need?

Microsoft Word and Excel (2010 or later, or Microsoft 365). The files also open in LibreOffice. PDFs open in any PDF reader. No macros are used.

Can I add my company logo and use the files on my own projects?

Yes. Every Word form has a header with placeholders for your logo and company name, and all text is editable. In Excel you type in the white input cells; formulas are locked without a password so you can unlock them if needed.

Does it include specification limits?

No - by design. Acceptance limits, tolerances and contract periods differ between projects, so they are input cells you fill from your own specification and contract. The pass/fail checks then work automatically.

What is the sample data?

Two fictional projects - a G+7 building and a 10 km road - show the workbooks and forms completed. All sample data is labelled illustrative. Clear it and enter your own project.

Which contracts does it suit?

Letters and registers are written for FIDIC-based conditions, PPA standard bidding documents and similar forms. Clause numbers are left as placeholders for your contract.

How do I pay and receive the files?

Tap Buy now. You pay on our Ye-Buna page with telebirr, CBE Birr, bank or card (processed by Chapa) and then download the ZIP. Unzip it and start with the 00_START_HERE folder.

Set up your project office today.

Building + Road · 346 files · instant download

2,176 ETB

Buy on Ye-Buna

Questions? Message @conkey1 on Telegram.